Laserfiche WebLink
C_ Project Description. Describe aIl aspects of the-operation including min=ng, miii~, and <br />-exploration methods, materials, equipment, workforce; construction and operation schedule, <br />power requiremems, how clearing will be accomplished, topsoil stockpile, waste rock <br />placement tailings disposal, proposed number of drill holes and depth, depth of proposed <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and fihe size of runoff diversion <br />channels. <br />Exploration and mining will be smaIl. open nits and minor trenchinz in mineralized areas as indicated <br />on the maps. from .1 ac un to 1.0 ac. Areas aze irreeuIai and unpredictable on any~iven claim. <br />Materials include shovels. picks. hammers. chiseLs_ safety hats and. goggles. water canisters. claim Qoscs_ <br />silt fencing. reclamation seed. and small trees. <br />Equipment is both wheeled and track hoes and four-wheel drive vehicles. A buIIdozer maybe <br />used for some reclamation and re-cantourine of excavation and Drospect sites <br />No construction is proposed No power is needed. <br />(rf More space is rseeded to fzZl out a block of informaton, use additional sheets and attach to form ) <br />8-hours per day. Qther hand dieeingand mineral extraction will take pIacB aIl season until winter. <br />Threw to five people will compose the workforce. Oneperson will be the machine operator other , . <br />