My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139490
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:20 PM
Creation date
11/26/2007 8:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006034
IBM Index Class Name
Permit File
Doc Date
12/26/2005
Doc Name
Plan of Operation
From
Forest Service
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C_ Project Description. Describe aIl aspects of the-operation including min=ng, miii~, and <br />-exploration methods, materials, equipment, workforce; construction and operation schedule, <br />power requiremems, how clearing will be accomplished, topsoil stockpile, waste rock <br />placement tailings disposal, proposed number of drill holes and depth, depth of proposed <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and fihe size of runoff diversion <br />channels. <br />Exploration and mining will be smaIl. open nits and minor trenchinz in mineralized areas as indicated <br />on the maps. from .1 ac un to 1.0 ac. Areas aze irreeuIai and unpredictable on any~iven claim. <br />Materials include shovels. picks. hammers. chiseLs_ safety hats and. goggles. water canisters. claim Qoscs_ <br />silt fencing. reclamation seed. and small trees. <br />Equipment is both wheeled and track hoes and four-wheel drive vehicles. A buIIdozer maybe <br />used for some reclamation and re-cantourine of excavation and Drospect sites <br />No construction is proposed No power is needed. <br />(rf More space is rseeded to fzZl out a block of informaton, use additional sheets and attach to form ) <br />8-hours per day. Qther hand dieeingand mineral extraction will take pIacB aIl season until winter. <br />Threw to five people will compose the workforce. Oneperson will be the machine operator other , . <br />
The URL can be used to link to this page
Your browser does not support the video tag.