My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139490
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:20 PM
Creation date
11/26/2007 8:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006034
IBM Index Class Name
Permit File
Doc Date
12/26/2005
Doc Name
Plan of Operation
From
Forest Service
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oseph Dorris, Operator <br />Colorado Calumet Plan of Operations -January 1, 2006 <br />VII. TERMS AND <br />A. If a bond is required, it must be fiunished before approval of the plan of operations <br />B. Information provided with this plan masked confidential will be treated in accordance with the <br />agency's laws, rules, and regulations. <br />C. Approval of this plan does not constitute certification of ownership to any person named herein <br />and/or recognition of the validity of any mining claim named herein. <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, roles, or regulations. <br />E. If previously undiscovered cultw'al resources (historic or prehistoric objects, artifacts, or sites) are <br />exposed as a result of operations, those operations will not proceed until nofification is received from the <br />Authorized Officer that provisions for mitigating unforeseen impacts as required by 36 CFR 228.4(e) and <br />36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of five or until November 30.2011. <br />A new proposed plan of opemtions must be submitted in accordance with 36 CFR part 228, subpart A, if <br />operations are to be continued after that rime period. <br />G. Any use not specifically identified in this plan must be approved by the authorized officer in the <br />form of a new plan or plan amendment. <br />VIII. OPERATING PLAN ACCEPTANCE <br />I/We have reviewed and agreed to comply with all conditions in this plan of operations including the <br />required changes, modifications, special mitigation, and reclamation requirements. I/We understand that <br />[he bond will not be released until the AuUrorized Officer in charge gives written approval of the <br />reclamation plan. <br />~~~ 7 ~ o <br />Ope for (or Authorized Representative) Date) <br />IX. OPE][2ATING PLAN APPROVAL <br />Brent Botts Pikes Peak District Ranger <br />(Name) (Title()I <br />----J t orize Officer) ~Date)~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.