Laserfiche WebLink
E. If previously undiscovered cultural resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a. result of operations, those operations vviIl not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforseen impacts as <br />required by 36 CFR 228.4(e) and 3b CFR 800 have been complied with. <br />P. Tbs plan of operations bas been approved for a period of or until _ <br />A new or revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if <br />operations are to be co~inned after that time period. <br />VIIL OPERAT7NGPLANACCEYTANCE <br />. F <br />4, <br />UWe have reviewed and agreed to comply with all conditions in tiiisplan;,of operations including the <br />required changes, modifications; special mitigation, and reclamation regiiiremenis_ I/We understand <br />chat the bond wiII not be released until the Authorized Officer in charge gives written approval ofthe <br />IX OPERAT7IVGP.L4NAPPROYAL ~: ` <br />s.. (Name) <br />~' ~" <br />(Authorized Officer) <br /> <br />~, <br />