Laserfiche WebLink
C_ Project Description. Describe all aspects of the- operation including minim, milling, and <br />-exploration meflxods, materials, equipment, workforce,' consiructioa and operation schedule, <br />power requizements, how clearing will be accomplished, topsoil stockpile, waste rock <br />placemer~ tailings disposal,.proposed number of drill holes and depttS -depth of proposed <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. <br />Exp]oration and mining wiII be small. open pits and minor treachin~in mineralized areas as indicated <br />silt fencing, reclamation seed. and small trees- <br />Eauinment is both wheeled and track hoes and four-wheel drive vehicles. A buIIdozer may be <br />used for some reclamation and re-contourine of excavation and prospect sites. <br />No construction is proposed. No power is needed- <br /> <br />~f more spa.;e is needed to fill out a block of information, use additional sheets and attach to form} <br />8 hours per day Other hand die ig_ng_and mineral extraction will take place aTI season unkil wrote: <br />