Laserfiche WebLink
<br />EYHIBIT E - REGLAPIA'I'ION PLAN <br />Upon completion of the excavation, each phase area o~.~t of the dry <br />creek bed area will be reclaimed. After all areas hilt the .:reel: <br />bed are reclaimed, the creek bed area will be reclaimed. <br />Reclamation will be undertaken in the following manner Tor eac~~ <br />phase: <br />1. Level and re,rade disturbed areas land any' formerl;r <br />disturbed areas within the permit areal to form a gradual <br />Slope toward the dtw' creek bed area. Slopes will be a minimum <br />of 2°b and matiimum of -4 to 1. <br />'L. Reveg'etate per the accompanying recommendations in E\HIBIi' <br />I/J <br />Reclamation of the drv creek bed area shall be undertaken after all <br />other reclamation has been completed. It shall consist of simply- <br />smoothing out the creek bottom to the revegetated areas on eac4i <br />side. No reveQetation is proposed in this area. <br />A map on the next page shows the reclamation plan graphically. <br />