Laserfiche WebLink
u <br />i~ <br />lJ <br /> <br />10. Primary future <br />(Post-mining) <br />land use <br />(check one): <br />12 <br />13 <br />14 <br />Primary rep sent <br />land use <br />(check one): <br />Method of Mlnlnq: <br /> <br />-3- <br />J( Pastureland(PL) <br />Forestry(FR) <br />Recreation(RC) <br />Resources(WR) <br />General Agrlculture(GA) <br />W(Idlife Ilabitat(WL> <br />Industrial/Commercial(IC) <br />_ Solid Waste Dtsposal(WD) <br />X Pastureland(PL) <br />_ Forestry(FR) <br />Recreatfon(RC) <br />Resources(41R) <br />_ General Agriculture(GA) <br />_ Wildlife ilabllat(WL) <br />Industrial/Connnercial(IC) <br />x Quarry (QR) _ Solution (SO) <br />12a. Other: BrieFly explain mining method (e.g. Placer, truck/shovel). <br />On Slte Processing: _ Solution (SO> _ Chemical (CIU _ lhermal (TII) <br />Wash :;ans with _ Heap Leach (lIL) _ Vat Leach (VL) <br />water only. <br />Aoolfcation Fee: <br />Tire aplrllcatton fee for quarry mining !s $2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />is $3,100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee is $1,815. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where tire Dlvislon falls to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within IZO calendar days from tl~e date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Dlvislon or Board beFore a permit will be issued even 1f you receive an automatic <br />apiroval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERI1IT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of tire Act and the Mineral Rules and Regulations in effect at tl~e t(me the <br />permit is issued. <br />_ Cropland(CR) <br />_ Rangeland(RL) <br />Resfdential(RS) <br />_ Developed Water <br />Cropland(CR) <br />_ Rangeland(RL) <br />Residentlal(RS) <br />_ Developed plater <br />• <br />