Laserfiche WebLink
<br />EYHIBII' L - RECLAMATION COSTS <br />The maximum disturbance at any one time is when 1 phase is being <br />mined and another has vet to be reclaimed. This could not exceed <br />ten acres. Since no surTace material is proposed Y'or storage, th% <br />only reclamation items needed would be revegetation and some minor <br />grading to smooth the contours. Helow is our estimate oY such <br />expenses: <br />Mobilization - 5 5UU <br />Minor Grading, IU acres ~ 3100/acre - S 1.000 <br />Revegetation, lt) acres (w 5150/acre - 5 1.50U <br />SUD-total 5 3,V01) <br />15% Administration/Contineencies 5 450 <br />TOTAL BOND REQUIREPIENT 3 3.500 <br />