Laserfiche WebLink
<br />' EXHIBIT L <br /> RECLAMATION COSTS <br />' <br /> The two consecutive phases requiring the gre atest amount <br /> of reclamation work are Phases IV and Z (25.61 ac res t of bank <br /> slope grading and 23.52 acres t of revegetation). Costs of <br />' reclaiming the area disturbed in Phases IV and Z have been <br /> estimated based on the following data: <br /> 0 <br />63 <br />lb <br />@ $ 5 <br />67 <br /> . <br />/ <br />. . <br />Grass seed mixture, 9 lbs/acre <br />$ ... <br />. <br />' Fertilizer mixture, 100 lbs. AgriChem (N2) <br />(18-46-0) @ $9.60/100 lbs, and 80 lbs. <br /> AgriChem (P2O5) (34-0-0) @ $5.80 ........ ... 15.40 <br />' Mulch (straw), 53 bales/acre @ $0.70/bale .. ... 37.10 <br /> Labor, 16 man hrs/acre @ $6/hr . ........... ... 96.00 <br />' Per acre total .......... ...$154.17 <br />' Seed mixture drilling and mulch crimping, <br />labor, 1 hr/acre @ $40/hr . .................$ 40.00 <br />' Slope grading and reshaping, 2 hrs/acre <br />@ $40/hr . ..................................$ 80.00 <br />' Thus, reclamation costs for the combined acreage in <br /> Phases IV and Z are as follows: <br />' Revegetation, 23.61 acres @ $154.17/acre 53,639.95 <br /> Seed mixture drilling and mulch crimping, <br />' 23.61 acres @ $40/acre 944.40 <br /> Slope grading and reshaping, 25.58 acres <br />' @ $80/acre 2,046.40 <br /> TOTAL RECLA1~lATION COSTS, PHASES IV AND Z $6,630.75 <br /> State overhead (plus 10%) 663.08 <br />' <br /> TOTAL 57,293.83 <br />' Suggest bond be set at $7,300. <br /> <br />' 51 <br />