My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-08-28_PERMIT FILE - M1995035 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995035
>
1995-08-28_PERMIT FILE - M1995035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 5:06:01 PM
Creation date
11/26/2007 8:39:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995035
IBM Index Class Name
Permit File
Doc Date
8/28/1995
Doc Name
FAX COVER
From
TUTTLEAPPLEGATE INC
To
GREGG SQUIRE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3034526611 ~LE RPPLEGRTE INC ~ 172 P07 RUG 28 '95 12:53 <br />U.. L'1. 199 556 P.O. <br />FISCHER, HOWARD 6 FRANCIS <br />wfTDIMIivB Ar UW <br />125 6. HowEO awn o00 <br />Germs E. Fu.p,eH, P.C. p06T OFFICE ODX yOB <br />BTCrr.eti E. Mwwwo iOHT C0141Na, COIOnwUP T«•.HOw[ (070) ~B2-rr~o <br />6ener. O. fwww OObfz•o60y Te~cco.isn (Y70) X92.1720 <br />~i.sm WnuYm~ ~ <br />+n..ia`. <br />August 21, 2995 <br />DtLI{-SRBO vIa! FACeIS2LL~ TRA881[SB8Z0l1 <br />22J-3191 <br />pir David ~ Simpson <br />Connell Rmsources <br />4305 East Harmony Road <br />Fort Collins CO Q0525 <br />Dear Mr. Simpsons <br />I finally had the opportunity to confer with Mr_ weit¢el. <br />Box Z~lder will grant approval generally as outlined in your <br />letter of July 19. 1995. <br />Ditch arosaings require Complete detail since structures oause <br />more problems for ditch aompaniem than anything else. The ditch is <br />quite flat in thin area and so the design must be done so that the <br />flaw is not impeded. Most likely, a precast invert without a <br />bottom or with a flat bottom with the top level e]ightly below the <br />pzeaenC level. Evan then the flow of the ditch is slow in thin <br />area, some upstream protection again St erosion will be required. <br />The usual design calla for wing wells. The width of the structure <br />should essentially be the same width as the existing ditch. Fu11y <br />engineered plane and specs must be presented. Construction can be <br />dohs only when the ditch is not in use and that usually means <br />9Ctober 15 through April 15. Perpetual maintenance is required and <br />removal •t the termination of thR proposed gravel operations at the <br />discretion of Box Elder. <br />Mining within 100 feet is acceptable and unlee6 problems might <br />occur, Mr. weitxel seas no reason why mining operation oan not be <br />dono even when the ditch is running. But it is hie undarstandinq <br />that back filling is Contemplated ahd that an actual distance of <br />4oD feet will ultimately exiot between thn ditch and the westerly <br />edge of your pit. <br />All expenses incurred with Bex Y.lder because of this request <br />must be paid by Connell. This inoludes legal, ®nginevrinq, and <br />time for Mr, Wsittei and the ditch superintendents. An initial <br />deposit of $2,000.00 will be required. If this sum in <br />insufficient, Connell will be obiigated to pay the additional cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.