My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-08-28_PERMIT FILE - M1995035 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995035
>
1995-08-28_PERMIT FILE - M1995035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 5:06:01 PM
Creation date
11/26/2007 8:39:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995035
IBM Index Class Name
Permit File
Doc Date
8/28/1995
Doc Name
FAX COVER
From
TUTTLEAPPLEGATE INC
To
GREGG SQUIRE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3034526611 TUTTLE APPLEGATE INC <br />• <br />Mr. Gregg Squire <br />. Division of Minerals and Geology <br />August 25, 1995 , <br />Page 2 . <br />Connell should not be requ'ved to install groundwater monitor wells. The Wellington <br />Downs Pit will only require dewatering umil the reservoir liner is installed. The liner is <br />expected to be installed within the first three years of the start-up date. With this short <br />duration, dewatering will have a limited impact. Zhe only wells within 600 feet are <br />gravel pit wells. <br />D. Dave Simpson of Connell Resouice has clarified to us that the auger holes drilled in the <br />Wellington Downs gravel deposit yielded topsoil with an average thickness of .5 feet. He <br />said below the topsoil is a one foot deep silt and clay horizon suitable for plant growth. <br />Connell will commit to capping the reclaimed amag with a minimum of .5 feet of topsoil <br />and a minimum of .5 fcet of the silt and clay material. <br />Annual Rye Grass was selected as a topsoil stocl~ile rover because Connell is not <br />expecting to stockpile topsoil for more than one growing season. The concwrent <br />reclamation process will be continually utilizing available topsoil. <br />Connell will mix in Crested VVtteatgrbcs to sustain growth on the stockpiles for periods <br />longer than one growing season. The mixture will be band broadcast at rate of 16 pounds <br />per acre. Two thirds of the mixture will be aturual Rye Grass and the remaining 1/3 will <br />be Crested Wheatgrass. <br />3. ItedAmation Plsn <br />B. It is our understanding that compaction testing is the same as moisture/density. testing. ~" <br />Connell agrees to conduct moisture/density testing for every.10,000 cubic yards placed. <br />The composition of the material used in the construction of the reservoir liner is not <br />expected to change. Therefore, once the initial sieve and Atterberg limits have been <br />establisbed, additional testing is unnecessary unless the material's composition changes. <br />Connell agrees to do additional sieve analysis and Atterberg limits testing if the material <br />used to construct the liner changes. <br />D. Addressed in 2.D. <br />E. Enclosed is a new copy of Exhibit E. The word "should" has been replaced with the <br />word 'bvill" where applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.