My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139426
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:16 PM
Creation date
11/26/2007 8:39:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PART 816 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 816.97(d) Continued. <br />• <br />Alternative Land Us@s <br />All lands disturbed by mine related activities will be returned to <br />their premining land use. No changes will be made with respect to <br />the premining land use patterns described in Section 816.133. <br />Section 816.99 Slides and other damage. <br />(a) An undisturbed natural barrier shall be provided beginning at the <br />elevation of the lowest coal seam to be mined and extending from the <br />outalope for such distance as map be determined by the regulatory au- <br />thority as is needed to assure stability. The barrier shall be retained <br />in place to prevent elides and erosion. <br />r 1 <br />\J <br />All mining pits have been designed based upon recommendations by <br />CTL Thompson, Inc. Analysis of Pit Wall Stability included as <br />Exhibit 43, to this application. The highwalls on either side of <br />the pits have benches of undisturbed overburden to prevent slides. <br />(See: Figure 32, Typical Pit Cross Section.) All highwalls are <br />stabilized by continual backfilling of the mined out pit as con- <br />temporaneously as possible with mining operations as discussed in <br />the operations plan set forth at Section 780.11. As more fully <br />described in 780.21 and 816.46, drainage control facilities will be <br />installed and maintained outside the pit and highwall area to <br />control erosion and runoff from the permit area. Any drainage and <br />runoff which will occur inside the open pits will be retained <br />within them because the pits will be topographically lower than the <br />surrounding undisturbed area. Refer to Figure 33, Typical Stesdy <br />State Pit and Figure 32, Typical Pit Cross Section. <br />816-122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.