Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br /> <br />Task x : 007 Slate : Colorado Permivjobq : M-4000.030 <br />Date : 05262000 County : La Plara Ahbrevialion :none <br />User: RCO Sile:Agn-Dltl Gravel Pit Filename:M030.007 <br /> <br />Permit or other job action :New application - Onal reclamation <br /> <br />Task description : Spfead !0(/5011 on pit flo0~ <br /> <br />HOURLY EQUIPMENT COST Basic machine: Cat D9N (1995) Horsepovrer: 370 <br />Blade type :Semi-Universal <br />Anachment no. 1 : ROPS Cab Shilt hasis : 1 per tlay <br />Attachment no. 2 :3-shank upper <br /> Utilization W Cost data source : (CRG) <br />Cost Breakdown : Ownership cost hour : 441.20 NA <br />Operating cosVhour: 461.00 100 <br />Ripper op. cosVhour: 40.00 0 <br />Operator cosUhour: 423.12 NA <br />Total unit cosghour : 4145.32 Total fleet cosghour : (145.32 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,353 LGY lector: NA volume: 6,353 LCV <br />Source of quantity take-og :phased reclamation: 14 ac x 3"topsoil, carr/ed Imm top <br />Source of est. swell lector : Na <br />HOURLY PRODUCTION <br />Job Condition Correction Fadors <br />Average push distance: 100 feet Source <br />Unadjusted hourly production : 1099 LCY/hr <br />Malarial consistency description <br />Loose arackol/e <br />Average push gradient: 0.00 %(posJ <br />Average site altitude : 6,600 feet <br />Material weight : 2,550 Ibs/LCY <br />Material weigh) description <br />Earth -Dry packetl <br />JOB TIME AND COST <br />Fleet size: 1 Dazer(s) <br />Unit cost : 40.327 /LCY <br />Operator skill: 0.75 (avg <br />Material consistency : 1.20 (Cali <br />Dozing method : 1.00 (gen <br />Visibility: 1.00 (avg <br />Job eRciency: 0.63 (1sh/N <br />Spoil pile: 0.60 (/nb: <br />Push gradient : 1.00 (CeI i <br />Altitude: 1.00 (Ceti <br />Material weight : 0.90 (Cat i <br />Blade type : 1.00 (S or <br />Nel carreclion : 0.40 <br />Adjusted unit production : 444.01 LCY/hr <br />Adjusted Beet production : 444.01 LCY/hr <br />Total jab lime : 14.31 Hours <br />Total job cost : 44,079 <br />