Laserfiche WebLink
E <br />~'~' Fage 2 <br />j~ji <br />~'„ w <br /> <br />,, <br />~;~ <br />1~` <br />v , <br />,I;~~;f. <br />7~~ <br />r t' <br />~. <br />?~1; <br />.+ <br />i; <br />i <br />~. <br />. <br />i <br />~~ <br />1,000 gpm x 6 minutes x 3 lir./day = 430,000 gpd <br />x 1 ~ consumptive use = 72,000 gpd <br />72,000 gpd <br />326,000 gal./ .F. _ .22 A.I'./day x 150 days = 33 A.Pt. <br />Dust Suppression: <br />326,000 gal./$~. Pt. <br />II <br />Total Requirement per Year: <br />Evaporative l~ss 291.2 A.Pt. <br />Process loss I 33.n A.Pt. <br />Dust suparess}on 4.6 A. Pt. <br />Total Annual ~.oss 323.u A.Pt. <br />Direct Plow Requirements to Ii~et Demand: <br />322.3 A.P. j <br />150 days x 2 A.PC. <br />d. Quillen Company has a Co <br />Ido. 6 for 5.0 cfs industrial <br />other needs of this project. <br />e. The Company has "Authori <br />Discharge Elimination Systen <br />= 4.6 A.P. <br />= 1.1 cfs for li0 days <br />tional Industrial Decree in Taater Division <br />e. (Case tlo. 79CN200) to supply the loss and <br />tion to Discharge Under the idational Pollutant <br />Permit tlo. CO-0033133, County: Ploffat. <br />i' <br />~~Yii: <br />