My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139385
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:13 PM
Creation date
11/26/2007 8:37:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983216
IBM Index Class Name
Permit File
Doc Date
12/1/1983
From
MESA CNTY ENGINEERING
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ' • • <br />EXHIBIT "E" <br />LUFfSDEN CANYON GRAVEL PIT 112 <br />RECLAMATION PLAN <br />Currently, the applicant expects that mining reclamation operations <br />to be ongoing wi[h revegetation occurring in September and October. The <br />' total mined area, amounts to approximately 3.33 acres for the Lumsden <br />Canyon Pit 112. <br />' Side slopes of the pit area will be graded at a ratio of 3:1 (horizontal <br />vs. vertical) or to match existing undisturbed adjacent slopes whichever applies. <br />Native topsoil will be spread on sloped areas as required to a depth <br />of at least 4-6 inches until stockpiled supplies are exhausted. <br />All exposed reseedable areas will be reseeded as range land. All areas <br />seeded by the applicant will be broadcast in compliance with the following <br />seed quantities/acre. <br />Indian Rice Grass 4 lbs PLS/acre <br />' Blue Grama Grass 4 lbs PLS/acre <br />Fourwin;; Saltbush 4 lbs PLS/acre <br />Little ]tabbitbrush 4 lbs PLS/acre <br />PLS = Pure Live Seed <br />' At this time, the applicant plans to mine on an "as needed" operation. <br />Upon completion of mining efforts, processing equipment will be removed <br />' from the area. Pit slopes will be graded as previously mentioned con- <br />currently with mining operations. It is anticipated that intrinsic soil <br />' will promote rapid growth at the start of the spring growing season. <br /> In order to prevent soil erosion, all soil stockpiles will be graded <br />' and contoured to minimize potential damage from storm runoff. Natural <br /> drainage ways will also be contoured to prevent soil erosion problems. <br /> <br />1 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.