Laserfiche WebLink
~ STATE ~ COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street. Room 818 <br />Denver, Colorado 80203 <br />DECEIVED <br />Phone. 1303) 8663587 Response to Reclamation Permit Application Consideration <br />FAx: 13031 866-3 589 rt f'~ <br />httpl/waterstate.co.us/de(ault.htm HV O ~ 1999 <br />lls~on of Minerah 8 GecIO9Y <br />DATE: August 2, 1999 <br />TO: Thomas D. Gillis, Senior Environmental Protection Specialist <br />CC: Division 4 Office; District 42 Water Commissioner <br />FROM: Craig M. Lis, P.E.~~/`~ <br />RE: Operator: Elam Construction, Inc. ,Highway 50 Borrow Area No. 2, File No. M-99-076 <br />Section 32, Twp 2 S, Rng 2 E, Ute P.M., Mesa County <br />Landowner- <br />OF'ep(O <br />~s',R, <br />Nom;/ O <br />~o <br />Bil I Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />Slate Engineer <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must <br />no[ occur during or after mining operations. <br />The roposed operation will consume ground water by evaporation, -dust control, -reclamation, <br />water removed N the mined product, processing, -other: <br />. Prior to initiation of these uses of <br />ground water, the applicant will need to obtain either a gravel pit or other type of well permit, as applicable. <br />Prior to obtaining a permit, an approved water supply plan or decreed plan for augmentation is required. <br />Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the pemtit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for:uses at the permit site, -storage in [he <br />excavated area(s). The applicant will need to provide evidence to this office that the water is pemutted or <br />decreed for such uses. <br />Other <br />COMMENTS: <br />