Laserfiche WebLink
<br /> <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Nmural Resources <br />111 J Sherman St .Room ? 15 <br />Dem•er, Colorado 80?03 <br />Phone. 0031 866-3ih% <br />FAX. 1301) H32-H106 <br />August 5, 1999 <br /> <br />III IIIIIIIIIIIIIIII~F <br />999 <br />COLORADO <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />0. E C L A M A T I p N <br />MINING•SAFETY <br />Bil I O~.wro <br />Governor <br />G.eR E ~Valcher <br />E~ecwive Dmeaor <br />Mr. Thomas A. Logue nnichael B Lang <br />Di.ision Director <br />Elam Construction, Inc. <br />1225 South Seventh Street <br />Grand Junction, CO 81501 <br />RE: Highway 50 Borrow Area No. 2, M-99-076, Permil Lssuance -Construction Material Operation <br />Deaz Mr. Logue: <br />On August 5, ]999 the Division of Minerals and Geology found Elam Construction, Inc. to have satisfied the <br />applicable requirements of C.R.S. 34-32.5-101 et etc. for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and aze enclosing one copy for your use. It is your responsibility to comply with all of <br />the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all <br />of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy <br />of the permit and the permit application at the mining operation as a reference for operating personnel, to help <br />ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains [o Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each yeaz, August 5, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $350.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Sincerely, / <br />MICHAEL B. LONG ~~ /v i3 L l <br />Division Director ~ P'1" <br />MBL/SSS/SME <br />Enclosure <br />