My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139315
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:07 PM
Creation date
11/26/2007 8:30:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
allow access to the Cameo B seam to the southwest. If the Cameo B seam is <br />• abandoned due to poor quality, this area will also be mined to increase the <br />overall mining recovery for the Cameo C seam. <br />Recovery can also be increased by obtaining more Federal coal to the <br />west and north. These future lease acquisitions allow mining of the triangular <br />pieces of coal near the lease boundary. Alternatively, small panels with rooms <br />will need to be developed in these areas. The economics of these smaller <br />panels will be evaluated further as the C seam is being evaluated. <br />The projected annual tonnage from the Roadside Mine is shown on Table <br />4-lA. The Roadside South Mine is currently idle. <br />TABLE 41A <br />LOGICAL MINING UNIT APPENDIX <br />• <br />ROADSIDE NORTH MINE <br />PROJECTED ANNUAL TONNAGE <br /> South North <br />Year Portal Portal Total <br />1999 0 450,000 450,000 <br />2000 0 450,000 450,000 <br />2001 0 450,000 450,000 <br />2002 0 450,000 450,000 <br /> <br /> <br />PHCC R2P2 <br />Page 8 <br />2.28-99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.