My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139274
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:05 PM
Creation date
11/26/2007 8:28:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1987072
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATION & RECLAMAtION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The rnirrir~g will cornrnence at the faces of these r•ernair~ir~g <br />• coal reserves. The ntair~ entries were developed ~_ttilizir~g <br />conventional rnir~ir~g techrriq~.res. Panel developnter~t ar-eas <br />will extend fr•or~t the rnair~s as shown ..r. the Mime F'lar~ Map <br />(Map 10). The mine entries will be the main access for• rnen <br />and equipment into the operation, provide for inta;<.e and <br />exha~_rst, ar~d pr•c~vide for• cor~vey~~r• haulage of the coal fr•c~rn <br />the mine. <br />Hecause the nnning system is a conventional r•or~m and pillar <br />plan, sets of rooms wlll be driven at 60 and 9n degrees fr~~m <br />the rnairi er~tr•ies. Each set of r•oc~rn eritr•les car panels will <br />be separated from t-he adjacent panels ar~d the stain entries <br />by a barrier of coal. These pillars will be left between <br />• each panel ar~d the r~tair~ er~tr•les b~.it wl 11 later be r•ecover•ed <br />~_rpor~ pillar r-etr•eat front the rnlr~e. <br />The anticipated anr~~.ral ar~d total pr•~~d~.rctic~r~ of coal fr•~~rn the <br />A Searn is shown or. Table 5, F'r•o.jected Coal F'roductiori. <br />Py cor~tlr~~_ied ~_rtllizatior~ of the existing p~~r•tals of the <br />La F'lata #1 Mime, La F'lata Coal Corp. pr-opuses ir~cr•eased <br />recovery of reserves ar~d rnir~irnal s~_rr•face distur•bar~ce. The <br />main entries wi 11 be rrier~ted to parallel the ald wor•klr~gs <br />with the panels oriented parallel or perper~dic~alar• tc. the <br />property bo~_ir~dar-ies. This orier~tatlor~, as sh~~wr~ or. the Mine <br />Flan Map iMap 10), will r•es~_rlt In more recovery of reserves <br />of the R Searn dur•ir~g the coal extractlor~ process. <br />• <br />C. l IJ-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.