Laserfiche WebLink
• conveyor belts. The coal will them be tr•arrspor•~ted directly <br />to the outside of the oper•atior~. <br />Electrical System. Power will be brought into the mine and <br />fed into a substation located c~ri the Mine Facilities <br />Map (Map li). This substation will provide power for• b~_th <br />the s~_rrface support facilities ar~d fcir• the electrical <br />underground ey~_ripment. A rnine feeder will be located <br />r~ear• the rnine portal. F'awer• will be provided frc~rn the <br />station tc~ the r~tirre i'eeder at high voltage. The r~tir~e <br />feeder will deliver power underground to transformers which <br />will step down voltages for• distrib~_rtior~ to eq~_ripriter~t. <br />Production ~.rnit equipment in each section will be powered <br />front a power center. Eq~.ripntent trailing cables will plug <br />• into the pc~wer• center. The power syster~t will cor~tply with <br />all applicable Color-ado and MSHR r~_rles and r-cag~.rlations. <br />Eq~_riprnEar~t ._ l~he proposed rnachirrery for• the La F'lata #1 <br />oper•atioris will be equipped, maintained, ar~d operated to <br />ensure rnaxintr_rrn safety, pr•od~.rctivity, and q'_rality r_~f coal <br />production. <br />Fall undergro~_rnd equipment will be approved by the Mine <br />Safety and Health Fadrninistr-at ion. The ma.jca• ~_rr~derground and <br />surface eyr_riprnent to be utilised is set forth in 'fable 6, <br />Egtripntent List. <br />Roam and Pillar Mining. Roc~rn and pillar mining will account <br />• for• all the total projected tor~riage. This rnir~ir~g will be <br />2. OS-1 rj <br />