Laserfiche WebLink
Doc Date:12/11I2001 <br />^~.` _., III IIIIIIIIIIIIIIII <br />;r. _,_;_^~_____J <br />r ggy <br />//JJ J <br />IiOMG~([Qllf~ ~IiC. <br />September 25, 1985 <br /> <br />Mr. Randy Price SEP 2 6 I!a8.5 <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division MIN EG LAND <br />423 Centennial Building RECLAMATION DIVISION <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Technical Revision <br />Bear Coal Company, Mid-Term Review Process C-033-81 <br />Dear Randy: <br />In accordance with provisions of the Mid-Term Review Process, the <br />enclosed documents have been submitted as a Technical Revision to the <br />Bear Coal Company Permit No. C-033-81. <br />The Mid-Term Review Frocess involved mitic~atiriy some corice'rns of the <br />Division, as outlined in Cxhibit 15, and organizing the Bear Coal <br />Company Permit. The follov;ing action has been taken to mitigate the <br />concerns brought out in the Mid-Term Review Process: <br />• Two (2) additional volumes containiny Exhibits 15 through 27 <br />have been submitted; which contain responses, revisions; and <br />additions to the Bear Coal Company No. 3 Permit. <br />• A permit cross-reference guide has been provided to allow <br />the reader to find the various permit components: <br />• Environmer~ta] baseline information has been extracted from <br />the original Be~r• No. 1 and No. 2 Permit (February, I981) <br />and placed in Vrli;me I of the Bear No. 3 Permit. <br />• The Table of Contents has been revised to reflect the <br />addition of Exhibf~ts and baseline iriYOrmation to the permit. <br />This Table of Contents attd baseline information has been provided as a <br />separate document to be placed in Volume I of the Bear No. 3 permit. <br />