Laserfiche WebLink
Colorado Nined Land Beclaaatioa Division <br />........................................ <br />BSTINATINC FOBM - BULLD02B8 YOBB <br />................................ <br />Task t: 02 Prep, by: NCT Task File Naoe: N04S-02 <br />............ ......... ............. <br />Date: 03/29/92 Perett t:M-92-045 Mine: Cold Basin Mise <br />............ ......... ................................. <br />Perait Action: flegrade the eotire site <br />Task Description: 6egrade the entire Bite <br />HOUBL9 BGUIPMBNT C09T <br />"""" """ """' Basic Machine: Cat DTB Noraepawer: 215 <br /> Blade Type: Universal " """" <br /> Attachaest tl: BOP9 Cab Shift Basis: 1/day <br /> Attacbaent t2: NJA " """ " <br />Coat Breakdown: <br />" " """ "" Utilisation % (code Ako~ <br />Ownership coat/hr - 513.67 NIA <br />Operating 1 overhaul cost/hr- dater = 527.66 100 <br /> -ripper : 10.00 NIA <br />Operator cost~ht 120.68 NIA <br />Total egpt. unit coet/hr = 192.02 Total fleet coet(hr: X92.02 <br />