Laserfiche WebLink
III IIIIIIIIIIIII III <br /> <br />Colorado Nined Laod Beclanatioo Division <br />........................................ <br />SBTIMATINC FOBN - BULLDOZBB NOBS <br />................................ <br />Taek ~: 01 Prep. by: MCT <br />............ ......... <br />Date: 05129/92 Peroit I:N-92-015 <br />............ ......... <br />Peroit Action: aeu application <br />Taek Description: spread topsoil <br />Taek File Naas: N015-O1 <br />Nine: Cold Basin Nine <br />................................. <br />NOUNLT BGUIPNBNT C09T <br />"" "" """"" "' Basic Machine: Cat D7H Horaepouer: 215 <br /> Blade Type: Universal " """ " <br /> Attechaent I1: BOPS Cab Shift Basis: llday <br /> Attachaent 12: N/A """"" <br />Cost Breakdown: <br />"" " """" Utilitatioo 5 (code hka~ <br />Ownership cost/hr = 130.67 N/A <br />Operating t overhaul coat/h r- doter c 12T.66 100 <br /> -ripper = 10.00 N/A <br />Operator coat/hr = 120.68 NIA <br />Total egpt, unit costlhr c 582,02 Total fleet cost/hr: 182.02 <br />