Laserfiche WebLink
owNEa: SHERIDAN ENTERPRISES, INC. <br />PROJECT: LOMA PROJECT eoawc No. GW-3 <br />LocATION ; EAST SALT CREEK <br />COORDINATES N. E £LEV. PACE 1. OF 3 <br />~\ <br />i~ <br /> <br />o <br />~ Z <br />Q <br />W <br />~~2~ <br />~ Z <br />~" ~ ~ <br />S a LL a o 4¢ f PPall <br />ZfN W F'J <br />a <br />L DESCRIPTION OF SOUS <br />1 W <br />J ~ < N <br />y j <br />N j <br />~a"Sy~ <br />"W Z <br />3Y <br />W o g LLG.. <br /> • sm Sandy silt, light brown, dry <br /> gm/sm Sandy silt to silty gravel with medium-sized <br />5' gravel, medium brown, dry <br />l0 ~ <br />.~ 47 <br /> <br />15 .o <br /> <br />° <br /> <br />' <br /> <br />' <br />9eavier gravel, nediun to large-sized gravel <br /> . <br />• :! <br />~~ No drive for split spoon sample at 19 feet, hole <br /> caved in at approximately 7 feet <br /> Boulder, sandstone <br />5 <br /> o . <br /> 0 <br /> ~ No drive for split spoon sample at 29 feet, hole <br />0 caved in at approximately 29 feet <br /> e'= <br /> Boulder, sandstone <br />5 <br /> <br /> _L Water level, 4-17-81 <br /> "• Sandy silt to silty gravel with small-sized gravel <br /> ° medium reddish brown <br />~ ~ Water encountered in drilling at 37 feet <br /> 25 <br /> 0 <br />i n~ nF RnRinir Figure 4.1-4 <br />