Laserfiche WebLink
<br />j) If groundwater is not exposed there will be no injury to exiting water rights. <br />The applicant proposes to mine a dry pit so groundwater cannot be exposed. <br />k) Okay <br />l) Please describe what measures will be taken to minimize disturbance to the <br />hydrologic balance, prevent off-site damage, and provide for a stable <br />configuration of the reclaimed area consistent with the proposed future land <br />use. <br />m) Okay <br />n) Identify the primary and secondary commodities to be mined/extracted and <br />the intended use. <br />o) Name and describe the intended use of all expected incidental products to be <br />mined/extracted by the proposed operation. <br />4. Exhibit D - a) Okay <br />b) Specify whether the outslopes will be mined at 3:1 slopes or if they will be <br />graded to 3:1 a[ the end of mining activities. <br />c) (i) Okay <br />c) (ii) State at what point in the mining plan the site will be seeded. Explain <br />how the seedbed will be prepared. State the type, application rate, and <br />soil incorporation methods of fertilizer application, if any. <br />c) (iii) State the grass species to be planted and the applicable quantities. <br />Specify the quantity of each grass species as pounds of pure live seed per <br />acre. <br />c) (iv) Specify the application method for grass seeding. <br />c) (v) If a mulch is needed, specify the kind to be used, the crimping method, <br />and rate of application. <br />c) (vi) Not applicable. <br />d) You have specified that the access road will be left as-is for the benefit of the <br />landowner. However, you did not provide any documentation demonstrating <br />~~ that the landowner even wants the road. You need to obtain a letter, or some <br />other form of agreement, from the landowner which specifically requests <br />that the access road be left as-is when [Wining ceases. <br />e) Specify the reclamation treatment of the sediment control structure (berm). <br />f) Not applicable. <br />5. Exhibit E -Provide more details in Exhibit C how the entire site will be mined since you <br />propose to place topsoil in the southern permit azea, overburden near the center of the <br />~, .,~~' permit area and you delineate a "predisturbed area" in the north permit area. Will [he <br />1'~~ ~~"' stockpiled materials (topsoil and overburden) be removed and placed in other areas of the <br />' ° permit during mining operations? What is a "predisturbed area"? <br />6. Exhibit F - Provide a narrative identifying all the other permits and licenses that will be <br />required. If no other permits or licenses are required, say so. <br />7. Exhibit G -Okay <br />