Underground Utilities Proieet Components: <br />In conjunction with the future 6 North Mains shafr project and extension of the power distribution line, <br />TCC proposes to complete, in the area of the shaft pad, three power borehole drops, a bulk material <br />borehole drop, and a water borehole drop for the continued development and mining of the Northern and <br />Western Mine Districts. The boreholes will be drilled to a nominal 13-inch diameter. Water for drilling <br />operations will either be trucked-in by tanker or drawn from Fish Creek using a portable pump (under <br />TCC's Boettler Ditch water right - 144 cfs). If a portable pump is used, no clearing, grubbing, or other <br />surface disturbance will be required, and no petroleum products (other than fuel in the on-board tank for <br />the pump) will be used or stored in proximity to any drainage or within stream buffer zones. <br />MROS-198 2.05-45.6d 09/01/05 <br />