Laserfiche WebLink
<br />WYOD.dING FUEL COMPANY <br />SEDIAAENT POND INSPECTION FORPA <br />Pond <br />Date of Inspection <br />NPDES No. <br />EMBANKMENT <br />1. Evaluate the adequacy of the vegetative cover: Excellent, Moderate, Spotty, Poor. <br />2. Are erosion-formed gullies present? Extensive, Some, Very Few, None. <br />3. Is wave action causing erosion: On the upstream embankment? Yes No <br />At the principal spillway inlet? Yes No <br />4. Is the downstream toe of the embankment being eroded? Yes No The <br />cause of erosion is attributed to: Explain <br />5. Is seepage occuring through the dam? Yes No If yes could this seepage <br />potentially cause slope instability? Yes No Explain <br />PRINCIPAL SPILLWAY <br />• 1. Is the overall principal spillway system in good working order? Yes No <br />2. is the inlet free of debris or other restrictive materials? Yes No <br />3. Is the discharge outlet free of debris or other restrictive materials? Yes_ No_ <br />4. Is erosion occurring at the discharge outlet? Yes No If yes, evaluate the <br />severity: Extensive, Moderate, Just Starting, None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system currently capable of passing design storm <br />discharge? Yes No <br />2. Does it appear as if the emergency spillway has discharged water since thz last <br />inspection? Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe extent and location: <br />SEDID.AENT STORAGE CAPACITY <br />1. Has the design sediment storage capacity of the reservoir been surpassed? Yes_ <br />No If yes, explain <br />• Please add any special comments concerning potentially dangerous problems on the back <br />of this sheet. <br />Inspector <br />-4- <br />