Laserfiche WebLink
.h`..~.n:~ r.., ...... .... <br />i. ~ \, ~ ~~ <br />•~" YYY <br />EXHIBIT D - (Continued) <br />e. Time periods of each Phase shown on Exhibit D. <br />Gravel thickness varies - See Mining Plan, <br />Exhibit D. Overburden is described in Exhibit AA. <br />Siltstone-Claystone bedrocks stratum underlies <br />mineable sand/gravel material. <br />f. 14ining operation will include use of rock crushers, <br />concrete and asphalt mixing plants, and scales with <br />scale house. <br />EXHIBIT E - Reclamation Plan <br />a. The operator proposes to reclaim the aria through <br />development of water impoundments with seeded dikes <br />and picnic areas for recreational purposes. The <br />reclamation will consist of a series of impoundments, <br />generally within the natural ground water levels of <br />the immediate area. Because the bottom of the <br />excavations are well below normal ground water, the <br />future use is development of ponds to be used for <br />fishing at such time as stocking is accomplished. <br />The ponds will be separated by shaped dikes with <br />at least three feet of freeboard. Provision will <br />be made in reclamation for access to all locations <br />along roadways on the dikes as required. Each <br />slope o-f the dikes adjacent to water surface will <br />be graded to no steeper than three feet horizontal <br />for each vertical foot, and compacted using stand- <br />ard heavy duty earthmoving equipment. The majority <br />of the area of 246 acres will be reclaimed for <br />recreational purposes. Approximately 30 acres <br />along the west edge of the disturbed area will be <br />reclaimed fo.r commercial/industrial development <br />while area adjacent and north of disturbed area <br />will be .used for homesites. <br />b. This area can be reclaimed and used in much the <br />same way as the Barbour Ponds along Interstate 25 <br />immediately west of this site. The reclaimed area <br />used as a recreational area will fit well into the <br />agricultural zoning of the local land use plan <br />according to local zoning regulations. <br />c. The affected lands will be reclaimed for recreational <br />purposes within five years after each phase of <br />reclamation is commenced. Use of the reclaimed <br />land shall be in accordance with the limited <br />liability landowner liability law contained in <br />Article 41 of Title 33, C.R.S. 1973. <br />c-1. Grading - all grading will be accomplished as soon <br />as feasible approximately one year after the mining <br />process in a particular phase is completed, using <br />heavy earthmoving equipment. All areas outside the <br />site will be protected from erosion or siltation as <br />Shrrr ? of !~ X <br />