My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138996
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE138996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:39:46 PM
Creation date
11/26/2007 8:14:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Permit File
Doc Name
APPLICATION FOR MINING AND RECLAMATION PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Bell <br />t June 10, 1977 <br />Grand Junction, Cola. <br />t ~1r. Ed Gardner <br />Whitewater Building h1aterials Coro. <br />940 S. 10th St. <br />' Grand Junction, Colorado 81501 <br />' Dear Sir: <br />RE: Whitewater Pit X500 <br />' I have completed a detail cost estimate of the proposed relocation <br />of the Gateway Branch Toll Line which crosses Whitewater Pit X500. <br />The proposal to provide a dika on the north & south sides of the <br />future pi'..s for maintenance of the line under longer spans proved <br />to boa more economical plan at a present cost of approximately <br />$500.00 as compared to relocating the line along the entrance to <br />the pit area from Hwy X141 at a Cost of approximately X11,000.00. <br />' In addition to making a cost comparison of the proposals we may <br />consider that. the ling will become owt-dated or require reinforce- <br />,rent as the area southwest of Whitewater grows. In the event that <br />local orowth in the area prompts reinforcement the telephpne cpm- <br />pang would prefar to bury cable along Colorado Hwy 141 rather than <br />place aerial cable on the existino pole line. Future toll rein- <br />forcement will probably oe by Independent Company i`1icrowave and re- <br />moval of the pale line. <br />In summary, the present casts auated, with inflation factors addeo <br />' will bring the cost pf rebuiidir.g the line to $10,000.00 in 10 years <br />and $20,000.00 in 20 years. <br />' In our opinion the present line will becoma out-dated and be removed <br />or relocated by 'the term of the 50 year plan for Whitewater Pit -#500. <br />' Yours truly, <br />'Harold B,~Bz ksworth <br />Engineering Grou^ Supervispr <br />i <br />57 <br />' HBH:med <br />
The URL can be used to link to this page
Your browser does not support the video tag.