My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138980
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE138980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:39:45 PM
Creation date
11/26/2007 8:13:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006081
IBM Index Class Name
Permit File
Doc Date
3/8/2007
Doc Name
Approval Ltr- Bond Calc & PW
From
DRMS
To
Daniel J. Gaudreault
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado PermiUjob# : M-2008-081 <br />Date : 03/052007 County :Pueblo Abbreviation :none <br />User : DEG Site :Big "G"Gravel Pit Filename : M081-002 <br />Agency or organization name : DRMS <br />Permit ar other job action :New 112(1 <br />Task descdpflon :Reapply <br />HOURLY EQUIPMENT COST <br />permit <br />Basic machine :Cat D8R Series 11 - 8SU (200t Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />Operating cost/hour : $73.75 100 <br />Ripper op.cosUhour : $3.43 50 <br />Operator cosf/haur : $32.78 NA <br />Total unitcost/hour : $168.20 Total fleet cosUhour : x168.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,000 LCY factor : NA volume : 9,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted howdy production : 377.8 LCY/hr <br />Material consistency descdption <br />Consolidated stockpile <br />Average push gradient : 0.00 % <br />Average site altitude : 4,450 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Matedal weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 163.24 LCY/hr <br />Adjusted fleet production : 163.24 LCY/hr <br />Total job time : 55.13 Hours <br />Unit cost : $1.030 /LCY Total job cost : x9,274 <br />
The URL can be used to link to this page
Your browser does not support the video tag.