Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />• <br />E%1~BIT L <br />RECLA:~L~TION COSTS <br />SOARIrIG EAGLE GRAVEL PIT <br />The reclamation is based on the mining being done in Phases. A maximum of two Phases plus the <br />Processiug Sitz will be disturbed at auy one tithe. <br />Reclamation costs aze based on teclaimine t,~'o minine Phases of the minine azea and the <br />Proczssing Site. Seeding costs are based on 1~0% of the disturbed area. <br />The followine is a breakdown of the items included in the total reclamation cost: <br />i.Grading Slopes(3400 L.F.) D-7 Dozer ~0 Hrs. ia:530.00---------54000,00 <br />?. Replace Topsoil(6" Thick) 10,~~0 C.Y. ~ 52.0------------------526,375.00 <br />3. Szedina 19.7 Acres 'a~.51200.00---------------------------~--------523.640.00 <br />~retat: Ss4,ols.oo <br />