Laserfiche WebLink
-Utah lit.\1 Stone Cabin 3D Seismic Sur~cy Fnviromncnlal :\ssessment <br />Pagcloli <br />.. ~i ~ _ <br /> <br /> <br />Bill Barrett Corporation "'-'=='="= -°~" <br />Stone Cabin 3-D Seismic -- <br />Survey Project <br />Environmental Assessment UT-070-2003-15 <br />- August 2003 <br />f L <br />na Me <br />a <br />m <br />SOI B <br />' ~ uneu o <br />a <br />n <br />pme <br />Proparad by U <br /> Price Field OPoco <br /> Prlco, Uu~ <br /> <br /> TABLE OF CONTENTS <br />• Errata Sheet pncludes comment analysis) 3119104 3.2.12 Guttural Resources and Native Arnencan <br /> Religious Concerns <br />` CHAPTER 1 -- PURPOSE AND NEED 3 2 12.1 Affected Enwronrnent <br />- 1.1 INTRODUCTION 3 2 12,2 Environmental Consequences <br />-' 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION 3.2.12 2. t Alternative A -Proposed Action <br />- 1.3 SCOPE OF THE ENVIRONMENTAL ASSESSMENT (EA) 3.2.12-2.2 Alternative B -BLM Preferred <br />- 1.4 CONFORMANCE WFTH BLM'S LAND USE PLAN AND Alternative <br />-- RELATIONSHIP TO STATUTES, REGULATIONS. OR OTHER PLANS 3.2.12.2.3 No Action Alternatrve <br />- <br />' 1.5 ISSUES <br />3,2.13 Transportation, Recreation. and Safety <br /> 1.5.7 Crdlcel Elements 3 2 13.1 Affected Ernironment <br /> 1.5.2 Other Issues and Concerns 3 2 t 3.2 Environmental Consequences <br />.. 3.2.13 2.1 Alternative A -Proposed Action <br />... CHAPTER 2 -- PROPOSED ACTION AND ALTERNATIVES 3 2.13.2 2 Alternative B -BLM Preferred <br />,. 2.1 INTRODUCTION Alternative <br /> 2.2 PLANNING SURVEYS <br />32.13.2.3 No Acllon Alternative <br />_ 2.3 ALTERNATIVE A -PROPOSED ACTION <br />. 2.3.1 Source Generation 3.2.14 Visual Resources <br />, 2.3 t.t Explosives Detonation 32.14 t Affected Environment <br />. _ 2.3.1.2 Vibroseis Buggy-mounted Vibrator Sourre Generation 3 2 14.2 Environmental Consequences <br />-- 2.3.2 Data Acquisdbn 3 2. 14.2.1 Alternative A -Proposed Actiwn <br /> 3 2 14.2.2 AllernaUVe B •BLM Preferred <br />-- 2.3.3 Oemobllizauon Alternatve <br />-- <br />- 2.3.4 Support Operations 3.2.14,2.3 No Action Allernalae <br /> 2.3.5 Protect Activities and Schedule <br />-_ 2.3.6 Workforce CttAPTER 4 -• CUMULATIVE IMPACTS <br /> 2.3.7 Applicant-committed Environmental Protection Measures .t t INTRODUCTION <br /> <br />.. 2 3 7 t Foe Protection <br />2 3.7.2 Existing Facdrties/ROWs ProtectOn <br />•1 2 PRSENT/CURRENT AND PAST ACTIONS <br /> 2.3.7 3 Hazardous and Solid WastelTrash Disposal •s s REASONABLY FORESEEABLE FUTURE ACTIONS <br />.,, 2.3.7 4 publiGCrew Safety 1 4 CUMULATIVE IMPACTS <br />,,. 2.3.7.5 Water Resources and Wetland!R~panan Protection 4.4.1 Proposed Action -Past, PresenUCurrent and <br /> 2.3 7.(i Soil Resource Protecton RF F Actions <br /> 2 3 7 7 Vegetation Resources Protection <br />4A.2 BLM Preferred Alternative <br /> 2.3.7.8 Wildlife Resources <br />2 3 7.9 Wilderness Study Areas 4.5 CONCLUSION <br />Intl, ~~~~~~ uLhlm.,:,~~ •a,u,ru;hm I :\ tahlr~,(:.aurnl,.lum ; r, !unh <br />