Laserfiche WebLink
<br />f any of the mine dump material contains pyrite (i.e. White Cloud <br />and Wynona dumps), this material must be proven, to the <br />satisfaction of the Division, that the material is not acid- or <br />~~ metals-generating before is can be used as borrow material for the <br />tailings impoundment or any other use on the site. <br />/~yO~, ease provide the location and volume of topsoil stockpiles on the <br />0 DDD~~~"""7/ site. Please locate them on the Exhibit C Map. <br />The applicant will need to supply proof of ownership of the surface <br />~[~ and mineral rights on which the mill building and tailings <br />cT~ impoundment are located. The proof could include a copy of the <br />~~ Deed of Trust, Mining Claim Ownership, Lease Agreement, etc. An <br />affidavit is not acceptable. <br />a <br />/Is the 30' by 40' metal building to be constructed southwest of the <br />~~ millsite still planned to be constructed? If so, include the cost <br />of demolition and removal in the reclamation cost estimate. <br />Provide a detailed description of how the tailings will be <br />n~ deposited in the tailings impoundment in the future? The upstream <br />(~gJ' method as described in the current permit was not completely <br />followed. <br />Please provide proof that all three standpipes in the tailings <br />~~~ / impoundment are functional. <br />ease be aware that the Mogul Mine cannot be operated (i.e. <br />shipping of direct shipping ore to the smelter) under the current <br />prospecting permit. The operator will need to obtain a Mining <br />permit for the site before any material can be removed and sold <br />from the site. <br />yt~`'5. Exhibit D - It is stated in the first paragraph of the <br />~N Reclamation Plan that the site will be returned to a forest <br />~(~1~~1 environment. Are trees and shrubs going to be planted over the <br />~~ reclaimed tailings impoundment and White Cloud/Wynona mine dumps? <br />Please include an estimate of how many of each species that will be <br />~ planted and the costs associated with planting them. The Division <br />a ~ did not include the cost of planting trees or shrubs in the last <br />• y reclamation cost estimate. However, these costs will be included <br />~,~vo~ at this time. <br />d <br />%How will the pyritic material in the regraded White Cloud or Oscar <br />~` / dumps be isolated to prevent potential acid mine drainage from <br />~/ precipitation runoff? <br />k The application states that a layer of riprap consisting of <br />_ ~ irregular sized Boulder Creek Granite was placed along the lower <br />section of the tailings dam embankment for stability. As of <br />~f ~ September, 1994, this riprap has not been placed. Please provide <br />,r the cost of obtaining and spreading this riprap in the reclamation <br />tl'rq~ cost estimate. <br />