Laserfiche WebLink
SEDCAD 4 for Windows <br />r,,,.,..:..~,~ +ooa o~...vi., ~ ae,.,~~. <br /> <br /> <br />0 <br /> <br />r <br /> <br />This SedCAD run represents a conservative estimate of the runoff <br />and sediment generated from the portion of Refuse Area 2/3/4 <br />draining to Pond 2/3 for 20 years fo/%wing reclamation, C factors <br />are from the in/tia/seeded state fo/%wing mulching, No credit <br />was given for p/ant growth or soi/ conso//dation beyond initial <br />values <br />Curve numbers and erosivity factors reflect the soi/s rep/aced on <br />the refuse area. Water qua/ity was mode%d using pond-fu// <br />scenario for purposes of demonstrating treatment instead of <br />storage of runoff per Section 4,O5,6(3)(a), Factors reflect <br />conservative assumptions throughout these ca/cu/ations, Actual <br />sediment yields are expected to be much lower than presented in <br />this mode/ based on prior o~'~~lfvns of the existing facilities, <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970-675-4322 <br />Email: scottlw@deserado.com <br />Filename: RP-2-3 terrace -final wnfiguration.sc4 Printed 07-15-2004 <br />