Laserfiche WebLink
SEDCAD 4 for Windows <br />r....,,.:..~.~ ~ooe o.,.si~ i e..e,.,~~. <br />• <br /> <br /> <br />This SedCAD run represents a conservative estimate of the runoff <br />and sediment generated from the portion of Refuse Area 2/3/4 <br />draining to Pond 2/3 for 20 years fo/%wing rec/amation. C factors <br />are from the /nitia/seeded state fo/%wing mu/thing, No credit <br />was given for p/ant growth or soi/ conso/idation beyond initia/ <br />va/ues, <br />Curve numbers and eros/vity factors reflect the soi/s rep/aced on <br />the refuse area, Water qua/ity was mode%d using pond-fu// <br />scenario for purposes of demonstrating treatment instead of <br />storage of runoff per Section 4,05,6(3)(a). Factors reflect <br />conservative assumptions throughout these ca/cu/ations, Actua/ <br />sediment yie/ds are expected to be much lower than presented in <br />this mode/ based on prior o~~~vns of the existing facilities <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970-675-4322 <br />Email: scottiw@deserado.com <br />• <br />Filename: RP-2-3 terrace -final confguration.sc4 <br />Panted 07-28-2004 <br />