My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138643
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE138643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:39:19 PM
Creation date
11/26/2007 7:55:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
8/27/2002
Section_Exhibit Name
Exhibit 14 Hydrologic Monitoring Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE A (continued) <br />MONITORING SITES 8 FREQUENCY <br />SURFACE FLOW JUNE- SEPTEMBER <br /> CONTINGENT SAMPLING <br /> REGULAR SAMPLING (sample only when pumping site lob or tt5 is <br /> discharging, between 24 hours aker the <br /> discharge begins and 38 hours aker It ends) <br /> WATER LEVEL WATER LEVEL LAB SULFATE <br />SITE & FIELD WATER QUALITY <br />8 FIELD EC <br />AND LAB EC <br /> PARAMETERS <br />Foidel Creek <br />USGS 09243800 Schedule B Monthly only in Jun, Aug, Sept <br />8 Schedule B Monthly only in Jun, Aug, Sept <br />14 Schedule B Monthly only in Jun, Aug, Sept <br />304 Schedule B <br /> (flow only) <br />USGS 09243900 Schedule B Monthly only in Jun, Aug, Sept <br />Fish Creek <br />16A Schedule B Monthly only in Jun, Aug, Sept Weekly <br />• <br />302 Monthly One time: Jun-Sept. <br />1002 Schedule B Monthly only in Jun, Aug, Sept <br />27A Schedule B Monthly only in Jun, Aug, Sept <br />1003 Schedule B Monthly only in Jun, Aug, Sept Weekly Monthly <br />307 Monthly -Flow only, fields semi-annually <br />305 Monthly -Flow only, fields semi-annually <br />Trout Creek <br />301 Monthly Monthly Weekly Monthly <br />69 Monthly Monthly Weekly Monthly <br />1005 Monthly Monthly Weekly (EC only) Monthly <br />Middle Creek <br />MC-1 Schedule B <br />USGS 09243700 Schedule B <br />29 Schedule B Monthly only in Jun, Aug, Sept Weekly Monthly <br />Schedule B <br />June- Monthly <br />July -Monthly <br />August -Weekly <br />Sept. -First two weeks of month <br />• <br />MR 02-180 Exhibit 14-8 8/19/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.