Laserfiche WebLink
• POWDERHORN COAL COMPANY <br />Table 13-1 <br />Permit Area Building and Structure Inventory Continued <br />• <br />CAMEO REFUSE DISPOSAL AREA NO. 1 <br />Building or Structure Construction <br />Date Description <br />Sediment Pond #6 1980 Refer to Section 2.05.3 4 for detail <br />Underdrain No. 1 1980 350' long underdrain, filled with rip-rap, <br />covered with filter cloth <br />Underdrain No. 2 1980 700' long underdrain, filled with rip-rap, <br />covered with filter cloth <br />Underdrain No. 2A 1980 580' long underdrain, filled with rip-rap, <br />covered with filter cloth <br />Underdrain No. 3 1980 380' long underdrain, filled with rip-rap, <br />covered with filter cloth <br />Dip Section 1981 Low-water bridge, with 6-36" culverts encased <br />in concrete <br />Haul Road 4 1980 Rcad from Canal to CRDA 3 <br />Access Road 4 2002 0.2 mile tem ora road <br />Haul Road 5 1982 0.4 mile, 1112" rave{ base road <br />CAMEO REFUSE DISPOSAL AREA NO. 2 <br />Building or Structure Construction Description <br /> Date <br />Sediment Pond No. 10 1985 Refer to Section 2.05.3(4) for details and <br /> a endix 13-2 for desi n <br />Diversion Ditch 1985 Refer to Section 2.05.3(4) for details and <br /> a endix 13-2 for desi n <br />West Collection Ditch 1985+ Refer to Section 2.05.3(4) for details and <br /> a endix 13-2 for desi n <br />East Collection Ditch 1985+ Refer to Section 2.05.3(4) for details and <br /> a endix 13-2 for desi n <br />Haul Road 6 1985 280' ravel road with culvert at CRDA No. 2 <br />T13-1-7 <br />(Rev 2/02) <br />