Laserfiche WebLink
e. Berm Areas : A single berm will contain two aspects : eastern and <br /> ' western or northern and southern. As a result the Soil Conser- <br /> vation Service recommendations discussed in paragraphs a. and b. <br /> ' above regarding both seedling to grasses and planting of trees <br /> apply. <br /> ' 6. Time Elements : Because the duration of mining in a given phase area <br /> t depends upon the demand for paving, the reclamation schedule can not <br /> be determined accurately. However, the assumed time table when each <br /> tgiven phase area will be reclaimed is given below: <br /> ' TIME TABLE WHEN EACH PHASE AREA WILL BE RECLAIMED* <br /> YEAR RECLAMATION <br /> ' PHASE AREA ACREAGE IS COMPLETED <br /> 1 5. 3 2 <br /> t2 4.2 4 1/2 <br /> 3 4.9 7 <br /> 4 5.9 13 <br /> ' 5 4. 1 13 <br /> 6 3.6 9 <br /> ' 7 3.8 13 <br /> 8 4. 3 13 <br /> ' 9 2.9 11 <br /> ' 10 3. 1 12 <br /> 11 3.6 12 <br /> ' 12 3. 2 15 <br /> 13 3. 1 16 <br /> ' 14 3.5 16 <br /> ' 15 3.6 16 <br /> ' -30- <br />