My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978-07-13_PERMIT FILE - M1977315
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977315
>
1978-07-13_PERMIT FILE - M1977315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:49:29 PM
Creation date
11/26/2007 7:51:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977315
IBM Index Class Name
Permit File
Doc Date
7/13/1978
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> stated in the intermediate case above will apply, resulting in an operation <br /> with a duration of approximately 15 to 16 years. The assumptions stated <br /> ' under the third case above (the shortest duration) are also considered <br /> t improbable. It is BEST-WAY PAVING COMPANY' s intention to use its aggregate <br /> resources which occur in Greeley and Weld County, in that area rather than <br /> ' shipping those materials in bulk by rail to high demand areas such as the <br /> Denver Metropolitan Area. As a result, it is not really possible to assign <br /> ' a duration to this third category of assumptions except to state that in <br /> ' this case, the maximum anticipated duration for this operation will be 15 <br /> years. In summary, It is most highly probable that the duration of the <br /> ' mining operation at the site will be 15 to 16 years. <br /> ' 3. Equipment and Personnel : At present the equipment in use by BEST-WAY <br /> PAVING COMPANY Includes three loaders, one scraper, seven tandem trucks , <br /> ' and seven tractor trucks which can be used to pull either belly-dump <br /> trailers, end-dump trailers, water tankers, or low-boys (equipment- <br /> carrying trailers) . It is anticipated that one tandem truck and one <br /> ' tractor unit will be added to the fleet for every five years of continued <br /> operation. In addition , it is expected that one additional scraper will be <br /> ' added to the mining operation, resulting in a total of two scrapers , ten <br /> tandem and ten tractor rigs working at the site (assuming the intermediate <br /> duration case discussed above) . <br /> ' The present mining and paving operation involves a staff of about 55 <br /> ' people working one shift per day, five to six days per week. This figure <br /> includes office and maintenance staff as well as the construction personnel . <br /> ' If the assumptions of intermediate duration case stated above are assumed <br /> ' -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.