My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138429
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE138429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:39:06 PM
Creation date
11/26/2007 7:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987127
IBM Index Class Name
Permit File
Doc Date
7/30/1987
Doc Name
FILE M-87-127
From
MLRD
To
BUTALA CONSTRUCTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2/81 <br />7. TYPE OF OPERATIOY: <br />• Describe the type of operations which will be undertaken in conducting the <br />prospecting operations. Include equipment to be used, access and site <br />construction requirements, type of disturbance (drill holes, trenching, <br />shafts, etc.), anticipated relationship to surface and subsurface water <br />(protiimity to streams, penetration of groundwater aquifers), sampling <br />procedures (fluid, bulk, geophysical, etc.), and any other pertinent <br />information. (elttach additional page if needed.) <br />Prospecting site will be stripped by dozer, overburden and top <br />soil will be stockpiled and replaced upon affected areas. Top soil <br />h$1-e- <br />site will be prepared for core drilling to determine the extent of <br />hill <br />stream. No materials will be allowed to be eroded into this <br />r i ~ d. <br />8. RECLa2G1TI0:! _~fEaSL'RES: <br />State the measures to be taken to reclaim any affected land, and/or <br />permanently abandon any drill hole other than as described in the <br />"Prospecting Drill Hole 2.bandonment Guidelines," consistent with the <br />applicable requirements of Rule 5 and Rule 6 and any applicable <br />regulations promulgated thereunder by the Board. <br />0 erburden and to s~~il will be regraded onto affected sites <br />and planted/reseeded with respect to Sol onservation gui a Ines. <br />9. TERNS A\'D CONDITIO`IS FOR PP.OSPECTIVG OPEP_4TIONS: <br />1. Reclamation measures shall be fulfilled in a timely manner. <br />2. the prospecting operations described in t5 is notice will be conducted in <br />such a manner as to minimize surface disturbances. ?n addition to the <br />measures required in Rule 6, precautions to be taken include: <br />a. Confinement of operations to areas near e:cisting roads or trails where <br />practicable; <br />b. Drilling shall be conducted in such a way as to prevent cuttings and <br />fluids from directly entering any dry or flocaing stream channel; <br />c. Timely abandonment of drill holes upon completion as required by <br />Section 5.4 of this rule; <br />d. Reclamation of affected lands upon comoletion of operations or <br />phases of an operation; <br />• e. Backfilling and revegetating nay pits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.