Surface Facilities <br />The surface facilities transferred to TCC and CYCC will be reclaimed as described in the following sections. <br />• Any buildings or structures will be removed, utilities stubbed-off and plugged or capped at least 3 feet below the final <br />regrade elevation, and the affected azeas graded to blend with the surrounding terrain. Demolition debris resulting from <br />building and stmcture demolition will be buried at the base of the highwall. Topsoil will be applied consistent with the <br />amounts and locations shown on Map 29, Reclamation. Following topsoil redistribution, the azeas will be seeded with <br />the appropriate seed mixture. The re-grading, topsoil replacement, and seeding will be done in accordance with the <br />plan and applicable regulations. <br />As shown on Map 29, topsoil from Stockpiles SF-] and SF-2 will be redistributed over the eastern end of the surface <br />facilities. Topsoil from Stockpile SF-3 will be redistributed over the office/bathouse, portal, and wazehouse areas and <br />part of the existing waste rock dump. This topsoil is from a stockpile relocated from the backfill pad to SF-1. Topsoil <br />from Stockpile SF-4 will be redistributed in the warehouse area. Topsoil from Stockpile SF-5 will be redistributed on <br />the road corridor. Topsoil from Stockpile SF-6 will initially be redistributed over the waste pile in order to m;nim;~e <br />the need to relocate Stockpile SF-6, while establishing permanent perimeter drainage control for the waste pile. The <br />remainder of SF-6 will be redistributed over the office area, road corridor, tipple azea, original waste rock dump, and <br />batch weigh loadout facilities azeas. Topsoil from Stockpile SF-11 will be redistributed on the road corridor. <br />Topsoil from the footprint of the new waste pile area was salvaged and added to Stockpile SF-12. A maximum of <br />154,880 CY was stripped (18-inches over the area of the pile) and placed in Stockpiles SF-12, 13, and 14. The majority <br />of the topsoil placed in Stockpile SF-12 will be redistributed over the waste pile during the reclamation process, with <br />the exception that sufficient yazdage will be pulled from Stockpile SF-12 to offset yazdage from Stockpile SF-6 used in <br />reclaiming portions of the waste pile. Offsetting material volumes from Stockpile SF-12 will be used for the office <br />area, road corridor, tipple area, original waste rock dump, and batch weigh loadout facilities azeas. )n addition, certain <br />topsoil stockpiles are dedicated to a particulaz disturbance area. Those stockpiles aze SF-9 and 10 -railroad track <br />extension, SF-7 -coal stockpile expansion azea, W WTF -waste water treatment facility, RDT-1 - rockdust tank, FCB- <br />• 1, 2, 3, and FCVF-1 -Fish Creek Borehole azea, and SSS-1 -power borehole. <br />Fish Creek Dewaterin¢ Site <br />The Fish Creek Dewatering Area will be regraded following removal of the facilities. Topsoil stored adjacent to the <br />site will be spread evenly over the regraded surface. <br />After the power system of the Fish Creek Dewatering Site is no longer required, the substation will be removed and the <br />azea reclaimed. Reclamation for the dewatering borehole substation will include the following; fence removal, pole <br />removal, transformer removal, concrete pad removal, topsoil replacement, and seeding. Topsoil will be placed and <br />bladed over the gavel surfacing material, or if other gravel is needed for road maintenance, it will be removed prior to <br />topsoil placement. The azea will be seeded with the rangeland seed mixture. Approved permanent access roads will <br />remain intact for use by the surface owner. During the 10-year liability period, TCC will maintain the road for <br />monitoring purposes. After bond release, the land owner will assume responsibility for the road. The northern short <br />section (2,500 feet) of the access road will be reclaimed unless otherwise approved by CMLRD. <br />Rockdust Tank <br />After removal of the rockdust tank and cement pad, the pit nur gravel of the truck access/unloading azea will be <br />dispersed across the .5 acres of disturbance. The area will be ripped before the stockpiled topsoil is reapplied. <br /> <br />MR07-215 2.05-101 05/10/07 <br />