Laserfiche WebLink
• <br />PART 1 <br />Page lh(iil of 19 <br />Permit No.: CO-0027154 <br />B. MONITORING REQUIREMENTS (Continual) <br />2. Monitorine and Rzoortin¢ <br />Rzportine of the above data shall bz on a monthly basis. Refer to Part <br />I.D.2 for specific rzauirements. <br />Sampling by the pzrmi[tze for compliance with [he monitoring <br />requirements spzcified abovz shall be performed at the followin¢ <br />locations: Outfalls 001, 002, 003, 004, 005, 006, 007, 08, 009, 010, <br />016, and 017, as shown in Figures 1, 2, 3, 4, and 5. <br />The permittzz shall also rzport the calculated valuz for total <br />rzcoverable manganesz from outfall 019, which is determined from the <br />flows and total recoverablz manganese valuzs from outfalls 001, 005, <br />and 007 as spzcifizd in Part I.l.f of the permit. <br />Monitoring by the Division for thz purposz of compliancz and/or <br />enforcement of the effluent limitations shall ba pzrformed as per <br />"Samplz Type" specifizd above. <br />• <br />3. Flow Mzasuring Exemption or Modification: <br />Not Applicablz <br />CJ <br />See part I.C. for Footnotes <br />Amznd~d 03/19/87 <br />Amended 05/27/88 <br />Amended 12121/88 <br />Amended /CJ;~~/5-9 Effzctive/'~ ai/~ <br />