Laserfiche WebLink
Percent Solids Of Residuals Longmont -Twenty-five percent lo~al solids <br />Used For Application Betasso -Fifty percent total solids <br /> 63rd WTP -Eighty percent total solics <br /> Average percent total solids -fifty-l'nree percent <br />{Pill The Residuals Be Yes, temporary stock pile (less Char. two years) to create top soil <br />Stockpiled At The Site?: mixture. Mixing area shall be man~;ed to prevent movement or <br /> runoff from the area. (see attachment B, in the area under <br /> "Proposed Contours" is a large depression of approx. 2 acres to <br /> be used as stockpile and mixing area. This area will provide <br /> complete containment for the stoc}:oi1e and mixing +jrea <br />Manner Of Residuals Top soil mixture shall be applied tc the sites by bulldozer or <br />Application: other heavy equipment <br />Manner Of Residuals Surface Application <br />Application: <br />Post Application Monitoring David Buckner, ESCO Associates, [nc. has been contr~deted to <br /> monitor and identify measures whr°h remediate any detrimental <br /> impacts from application of water =reatment plant residuals. <br />General Water Use And Location <br />Nearest Class I Recreat:cnal Reservoir: Marshall Reservoir 1,000 feet down-gradient <br /> from North site <br />Nearest Surface Body 0~ Water: Marshall Reserver 1,000 feet down-gradient <br /> from North site <br />Use Of Surface Body Oi Water: Agricultural irrigation and municipal water <br /> supply <br />Nearest River, Stream. And/Or 1. Coal Creek or. northern edge o' south site <br />Irrigation Ditch: 2. One irrigation. headgate on north edee of <br /> south site <br />Use Of River, Stream. =.nd/Or 1. Agricultural i-rigation and municipal wafer <br />Irrigation Ditch: supply <br /> 2. Agricultural :-rigalion of property east of <br /> reclamation area <br />Page 4 <br />