Laserfiche WebLink
<br />EXHIBIT B - MINING PLAN, <br /> <br />The proposed operations of the Jesse Lee Placer Mine will be in <br />stages, which are as follows: <br />Stage I will consist of excavation of material to <br />existing water lever(estimated to be approximately <br />15 feet) by use of a backhoe and hauled by truck to <br />a two(2) decked screening operation. The material <br />in excess of 12-inches in size will be wasted, and <br />returned to the excavated area at a latter date. <br />Stage II will consist of screen of the remaining <br />aggregates(12-inch minus) on a secondary screen, with <br />the final sizing being 3/4-inches to 1~-inches. <br />This material will be saved and hauled to a stockpile <br />area. <br />Stage III will consist of slucing by use of a Shaker <br />Sluice Box with water of all the remaining materials <br />less than 3/4-inches. The mineral content in the <br />material will be retained on the sluice box and all <br />the remaining materials washed over the sluice box. <br />This material will be saved and hauled to a seperate <br />stockpile area. <br />The production rate will be approximately 400 cubic yards per <br />day. The number of work days per year will vary from 160 to 200, <br />depending upon the weather conditions. <br />