Laserfiche WebLink
• <br />;. Manpower <br />a) Operating lime = <br />h) Hourly wage = <br />c) Total Manpower Cost = <br />4. Total l'opsoi~l/ing Cost = <br />c. Diversion Ditch Restoration (, <br />I . Equipment Assumptions -Cat D7 with straight blade <br />a) Production = <br />b) Operator x .75 <br />c) Material x 1.20 <br />d) Grade x I.00 <br />e) Job efficiency x .83 <br />t) Adjusted Production = <br />g) Total time far diversion ditch restoration <br />of 5.6 yd3 = <br />2. Equipment Costs <br />a) Cstimated use <br />b) Nourly rental <br />c) Operating Cos[ <br />d) Total Rental and Operating Cost <br />r ~ <br />U <br />3. Manpower <br />a) Operating Time <br />b) Hourly wage <br />c) Total Manpower Cos[ <br />4. Total Diversion Uitch Reconstruction Cosi <br />E Revegetation <br />1. Material and Equipment Cost <br />a) Perennial Seed <br />b) Chisel and Planting <br />c) Contour Furrowing <br />d) Shrubs $.37 ea; 1000 per acre <br />e) Planting Tractor <br />f) Labor(2 operators) <br />2. Total Cost per Acre <br />3. Tolal Cos[ Per .34 Acre <br />g. Miscellaneous <br />I . 2 expanding type plugs at $42.00 each <br />h. Overhead <br />I . Assume 10% Total Cos[ <br />. a) Material Removal <br />b) Ripping <br />c) Pit Run Gravel Dispersal <br />a.5 hours <br />$ 18.9(1 <br />tiS3.llll <br />$S> I?i <br />60(1 vd~/hi <br />44S vd'/hr <br />.0l hour (25hr.) <br />1i hour <br />$148.0 <br />$? I .RO/hr <br />$4?SO <br />2~ hour <br />$ 18.90 <br />$4.7 <br />$47.25 <br />$ 75.00/acre <br />$ 95.00/acre <br />$ 23.00/acre <br />$370.00/acre <br />$ 16.00/acre <br />$ 10.00/acre <br />_ $589.00 <br />_ $200.25 <br />_ $54.00 <br />_ $2886.00 <br />_ $ 533.00 <br />_ $ 189.00 <br />MR 97-154 1(h) 10/2/97 <br />