Laserfiche WebLink
I:. Fish Creek 13orchnlc Area = 5 h,nu, <br />• Toull = I ;? hnun <br /> i. I Up50111n!' <br /> A. bVaste Rock Disposal Area = 6=1 hours <br /> B. Portal and Adjacent Surface Disturbed Areas = 334 hours <br /> C. Materials S[ora~e Area = 28 hours <br /> D. Access/Haulroad = IG hours <br /> E. Fish Creek Borehole Area = I G hours <br /> Total = 4~ti hours <br />V. L=~iuipment Costs (bas-ed on Rental Rate Blue Book) <br /> ;\ Assu mptions <br /> I. Ishift/day = 3~ hours/week <br /> 2 shifts/day = 70 hours/week <br /> 2. Work 7 hours/8 hour shin (includes lunch and shift change) <br /> R. Cat D10 Dozer <br /> I . Total Time = 2.036 hours <br />• 2. Rental Rate = $29.148.00/m0 <br /> Operating Cost = $69. I i/hour <br /> 3. Rental Time = 2,026 hours/70 hours/week = 28.9 weeks = 7 months <br /> 4. Rental Cost = ($29, i48.00imonth)(7months) _ $204.036.00 <br /> ~. Operating Cost = ($69. I S/hour)(2,026 hours) _ $140.098.00 <br /> G. Total DIO Dozer Rental and Operating Costs <br /> Renal = $204.036.00 <br /> Operation = $140.098.00 <br /> _ $344, 134.00 <br /> C. Cat I GG Grader <br /> I. Total Time = 137 hours <br /> 2. Rental Rate = $4,126A0/week <br /> Operating Cos[ _ $2625/hour <br /> 3. Rental Time: 137 hours/3> hours/week = 3.9 weeks = 4 weeks <br /> 4. Rental Cost ($4,126.00/week)(4 weeks) _ $16,504.00 <br />• ~. Operating Costs: ($2625/hour)(137hours) __ $3.596.00 <br />M R 97- 154 1(c) 10/2/97 <br />