Laserfiche WebLink
UA. ~+dJilioual tau/Substation M1lodilirltiuu 13und Calculalinn - h7inur Rcvisiou 87-117 and 87-IIR <br /> <br /> I. I; 11114 III'' DCI110II110^ <br /> ?Il X 30 X S = 33110 It' <br /> 3200 li3 ...13e'ri3 = $a la.oo <br /> I I. pan & Motor Removal <br /> ? hrs. X $202/hr = $404.00 <br /> Total = $820.00 <br /> III. I :w Duc[ Demolition <br /> 95' X 18' X 10' = 2,350 ft3 = G33 Cl' <br /> Push duct into high+aall to demolish before covering with <br /> spoil material <br /> D 10: production = 2750 Cl'/hr <br /> 2750 Ch'ihr for 633 CY is .23 hours or I5 minutes <br /> Equipment Cost <br /> Operator Cost = $ 69. I S/hr <br /> Rental Cost = $ 165.61/hr <br /> Total = $ 234.76/hr <br /> l~hus, I5 minutes would be about $58.75 <br /> Labor cost <br /> $18.50 per hour for I S minutes is about $4.75 <br /> Total tan demolition = 63.50 = $64.00 <br /> Total Fan Removal and Disposal = $884.00 <br />• <br />Q. tiubstahan Removal <br /> I. Fence Removal - 8' fence <br /> 348 linear feet <br /> 348 linear ft a[ $1.22 per linear foot = $424.56 <br /> II. Equipment Removal <br /> a) Transformer 1 <br /> approximate size 7' X 6' X S' <br /> remove from pad and place on trailer <br /> I hr X $202/hr = $202.00 <br /> h) Transformer 2 <br /> approximate size 9' X 8' X 9' <br /> remove from pad and place at trailer <br /> I.5 hr X $202/hr = $303.00 <br /> c) Transformer 3 <br /> approximate size 9' X 6' X S' <br /> remove from pad and place on [railer <br /> I hr X $20?,~hr = $202.00 <br /> d) Switch gear I <br /> approximate size 6' X 5' X 10.5 <br /> remove front pad altd place on trailer <br /> I Itr X $202/hr = $202.00 <br /> e) Switch gear 2 <br />• approximate size 16' X 7' X 8' <br /> remove from pad and place olt trailer <br /> 2 hr X $202/hr = $404.00 <br />M R 9 7- I S4 4 10/2/97 <br />