Laserfiche WebLink
- ~ Ai <br />srnnc o5= coi oanno nu nnni~ i,. i n~n~w~ ~" ~~ III III III IIII'11111 <br />DEPARTMENT OF NATURAL RESOURCES 999 <br />D. Monte Pascoe, E.ecu rive Director <br />MINED LAND RECLAMA'TIUN <br />423 Centennial Building, 7313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />May 18, 1982 <br />Mr. La Vern Nelson, P.E. <br />Nelsoh Engineers <br />Greeley National Plaza <br />822 7th Street <br />Greeley, Colorado 80631 <br />Re: Siegrist Construction Company <br />Sand and Gravel Pit <br />Our File No. 82-15 <br />Dear Mr. Nelson: <br />This is to inform you that Mr. John Slovek has sent a letter to the <br />Afined Land Reclamation Board objecting to this application. A copy <br />of this Zetter has been enclosed for your review and comment. I have <br />also enclosed a copy of the Division of Wildlife review for your <br />information. <br />After reviewing your letter of May I3, 1982, I have the follocring <br />additional questions and comments which must be addressed in detail <br />prior to the May 26-27, 1982 meeting of the Mined Land Reclamation <br />Board: <br />A. Exhibit E - Reclamation Plan <br />1. It was stated that the operator was going to utilize the <br />silt overburden material to replace materials removed within the <br />excavation area and in reconstructing the stream banks. Since this <br />material is highly erosive, hoar does the operator propose to keep the <br />Saint Vrain River from breaching the buffer strip and meandering through <br />the excavation area during periods of flood? What techniques will the <br />operator utilize to protect,and stabilize the bank through the pit area? <br />B. Exhibit L - Reclamation Costs <br />1. The staff is in agreement with the proposed reclamation costs. <br />