Laserfiche WebLink
Banks and Gesso, LLC <br />Exhibit S -Permanent Man-made Structures <br />Permanent man-made structures located within 200 ft of affected areas are as follows <br />(see Exhibit C-1 for structure locations): <br />1. Windsor Water Pipeline -Town of Windsor <br />2. Eaton Ditch -Windsor Reservoir and Canal Co. <br />3. Poudre Trail -Poudre Trail District <br />4. Everitt Barn -Stanley and Sara Everitt <br />Based on the use of adequate setbacks and because no blasting operations will be <br />performed, it is not anticipated that the proposed mining operations or reclamation plans <br />will adversely affect the stability of these structures. Notarized agreements or a slope <br />stability analysis will be obtained prior to mining within 200 feet of these structures. <br />Raindance Sand and Gravel Mine March 18, 2004 <br />Hilltop Aquatic Investments, LLC 2g 04001 <br />