RECLAMATION COSTS <br /> <br />EXHIBIT L <br />The worst case reclamation costs occur when the mining is completed in Area 5 and final backfilling <br />is needed on the southern part of this area as well as topsoiling and seeding. Mining will commence <br />on the northern part and progress south to keep the amount of backfilling required at the end of <br />mining to a minimum. By mining south the operation will connect to the drained lake of Mining <br />Area 3. As mining progresses to the south in Area 5, all the land peninsulas will be built from the <br />overburden ahead of the active pit. Therefore, at the end of mining, backfilling and grading is <br />limited to the lower two sides of the Land peninsulas for a distance of 180 feet to the north. This is an <br />azea of 1.4 acres. The detailed tasks are given below: <br />1) Backfilling the southern part of the pad area (approx 1.4 acres) for Area 5. Since the final land <br />surface is 4468' and the pit bottom is approximately 4433', the azea will be filled 35' high. This is <br />79,000 cy. Material will come from a neazby pile in Area S left for this backfilling. <br />2) backfilling of slopes in the upper half of Area S lake to 3H:1 V based on 800 feet length and 578 <br />. sq. ft x-section (from 2:1 to 3:1) = 17,000 cy. Material will come from a neazby pile in Area 5 left <br />for this backfilling. <br />3) topsoiling will be needed along all land azeas of Area 5 as well as the final facilities azea. This is a <br />total of 20.1 acres. As shown in the reclamation plan, placing 8" of soil on these azeas requires <br />21,618 cy. The soil wilt be obtained from the two stockpiles shown on Map C-2. <br />4) revegetation will be needed along all land areas of Area 5 as well as the final facilities area and <br />the two topsoil stockpile azeas once the topsoil is removed. This is 22.1 arms. <br />n <br />U <br />15 Road Pit 10/02 45 <br />