Laserfiche WebLink
governmental authorities. Hot bituminous pavement made on site is not stored in the permit area; it <br />. is taken directly to the job site. The operation will use an existing graveled access road (15 Road) to <br />gain access to Highway 50. Primarily, 24 ton belly dumps will be used to haul both asphalt as well <br />as some washed sand and grave[ to job sites. Most raw sand and gravel will be shipped with 14 ton <br />tandem trucks. <br />Of the total permit azea of 188.54 acres, the total disturbed azea is 184.64 acres. The breakdown of <br />this acreage is given below. It is based on the azeas of full mining and is not a worst case distur- <br />bance for the life of the pit, since many azeas will be reclaimed as new areas are mined. <br /> <br /> <br />Permit Area Description Acreage <br />1. SoillOverburden Stockpiles 7.5 <br />2. Sediment Pond 0.9 <br />3. Mining Areas to be reclaimed as lakes and industrial pads. Includes Process- <br />ing azea with stockpiles, scale, trailer, fuel farm. 158.1 <br />4. Internal Roads 11.2 <br />5. Gas Line & Power Line ROWS 6.9 <br />6. Undisturbed Area 3.9 <br />Total 188.5 <br />15 Road Pit 10/02 <br />16 <br />